prov #44 (d9399223c3caa4f9) hit the catalyst-api 60m phase1 watch cap with bp-catalyst-platform HR still mid-retry (failures=3) and 41/45 HRs True. F1-F7 are correct and live on main (qa-finalizer-strip Completed, autoscaler workers joined). The remaining wall is total bootstrap-kit install time exceeding the outer watch budget on a fresh cpx42×1 Sovereign without a warm Harbor proxy-cache. Two lock-step changes widen both bounds: 1. clusters/_template/bootstrap-kit/13-bp-catalyst-platform.yaml: install.timeout 15m → 30m, upgrade.timeout 15m → 30m. The umbrella chart genuinely needs >15m worst case when the full SME + Catalyst service stack rolls cold. 2. products/catalyst/bootstrap/api/internal/helmwatch/helmwatch.go: DefaultWatchTimeout 60m → 120m. Worst-case inner HR retry chain is now 30m × 3 = 90m; the outer phase1 budget MUST be larger so the watch never terminates while helm-controller still has remediation attempts left. CATALYST_PHASE1_WATCH_TIMEOUT env-var override path was already wired (issue #538 baseline) — chart template now declares the explicit "120m" value so the runtime knob is discoverable for capacity-bounded environments. Per INVIOLABLE- PRINCIPLES.md #4 the knob remains runtime-configurable. New unit test TestPhase1WatchConfig_ProductionDefaultIs120m pins the F8 floor against future regression. Existing env-var override + field- override tests still pass unchanged. Co-authored-by: e3mrah <1234567+e3mrah@users.noreply.github.com> Co-authored-by: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| api | ||
| ui | ||